Physical properties
Color / Gloss by color card / Highlight
Volume solid content 85%
Flash Point >24 ℃
Volatile organic components ( VOC ) approx. 185 gram / L
Density per litre 1.25 g / centimeter 3
Dry film thickness ( μm ) | Wet film thickness ( μm ) | Theoretical coating rate ( m2 / L ) | |
Film thickness range | 100 – 150 | 120 - 175 | 8.5 - 5.7 |
Recommended film thickness | 125 | 145 | 6.8 |
Construction instructions
Mixing ratio base material: curing agent = 84:16 (weight ratio ) base material: curing agent = 80:20 ( volume ratio )
Pot life after mixing at 10 °C: 6 Hours, 23 °C: 4 Hours, 30 °C: 3 Hours for brush or roller application, dilution ratio 0-5%
Airless spray nozzle pressure: 12-18 MPa
Spraying angle : 40-80 Spend
Nozzle aperture: 0.38-0.53 Millimeters
Dilution ratio: 0-3% ( volume ratio )
Air spray is not recommended
Thinner / Cleaning Agent 609 Polyurethane Thinner
It is recommended to add an appropriate amount of diluent after the paint base and curing agent components are evenly mixed.
Avoid adding excessive amounts of thinner, which will reduce sag resistance and extend curing time.
Drying time and time between recoating (1)
Substrate temperature | Dry time | Working time | Fully cured | Recoating interval (2) | |
Shortest | longest | ||||
10 ℃ | 6 hours | 10 hours | 7 days | 10 hours | 4 days |
23 ℃ | 1 hour | 6 hours | 5 days | 6 hours | 3 days |
30 ℃ | 45 minutes | 4 hours | 3 days | 4 hours | 2 days |
(1)The data is for reference only. The actual drying time and recoating interval depend on factors such as paint dry film thickness, ventilation, humidity and previous paint.
(2)The surface must be dry and free of dirt before overcoating. The adhesion of the subsequent coating is best when the previous coating is completely cured . If the coating is exposed for a long time, the surface must be roughened before overcoating to ensure adhesion between the coatings. When overcoating with a single-component paint, the maximum overcoating interval shall not exceed 24 Hour.
Surface treatment
The painted surface must be dry ; SSPC-SP1 According to the regulations , use solvent to remove all grease from the surface ; use clean water to remove salt and stains from the surface . The corroded area must be repaired with a suitable primer.
Construction conditions
The surface temperature of the substrate shall not be lower than 5 °C and at least 3 °C higher than the air dew point temperature, and the relative humidity shall not exceed 85% (the temperature and relative humidity shall be measured near the substrate).
The surface temperature of the substrate should not exceed 40°C . Otherwise, a suitable spraying method should be selected and appropriate diluent should be added as required to prevent dry spraying. In extreme cases, the dry film thickness of the coating can be appropriately reduced to prevent sagging.
When painting in a confined space, appropriate ventilation equipment must be provided to ensure the cure of the paint film.
After the base material and curing agent are mixed, the temperature must be higher than 15 ℃, otherwise a diluent should be added to achieve the required viscosity for construction.
Recommended Package
The following are typical high-performance coating systems:
TO 1.55 epoxy zinc-rich primer | 1 × 50μm | (Dry film thickness) |
TO 3.71 polysiloxane coating | 1 × 125μm | (Dry film thickness) |
Store
Must be stored in accordance with national regulations. The storage environment should be dry, cool, well-ventilated, avoid high temperatures and stay away from fire. The packaging container must be kept sealed. The storage validity period is at least 12 months.