Transpoxy Finish 4.60

Product Overview
Transpoxy Finish 4.60 is an epoxy topcoat suitable for interior and exterior applications. It has good resistance to solvents, oils and chemicals.
Contact us
Description

Physical properties

Color / Gloss by color card / bright

Volume solids 57%

Flash point >25 ℃

Volatile organic components ( VOC ) approx. 355 gram / L

Density per litre 1.25 g / centimeter 3



Dry film thickness ( μm )

Wet film thickness ( μm )

Theoretical coating rate ( m2 / L )

Film thickness range

50 – 100

87 – 175

11.4 – 5.7

Recommended film thickness

75

131

7.6


Construction instructions

Mixing ratio base material: curing agent = 80 ∶ 20 (weight ratio )

Base material: curing agent = 75 : 25 ( volume ratio )

Applicable time after mixing at 10 ℃: 10 Hours , 23 °C: 5 Hours, 30 °C: 2 Hour

Airless spray nozzle pressure : 18-25 MPa 

Nozzle aperture : 0.38-0.53 mm 

Spraying angle : 40-80 Spend

Dilution ratio: 0-3% (volume ratio)

Air spray nozzle pressure : 0.3-0.5 MPa

Dilution ratio: 0-10% (volume ratio)

brush or roller application , dilution ratio 0-5%

Thinner / Cleaning Agent 603 Epoxy Thinner

Nozzle aperture: 1.2-2.0 mm

It is recommended to add an appropriate amount of diluent after mixing components A and B of the paint evenly.

Avoid adding excessive amounts of thinner, which will reduce sag resistance and extend curing time.


Drying time and time between recoating (1)

Substrate temperature

 Dry time

 Working time

 Fully cured

Recoating interval (2)

Shortest

longest

10 ℃

8 hours

24 hours

8 days

24 hours

Indefinite

23 ℃

4 hours

16 hours

5 days

16 hours

Indefinite

30 ℃

2 hours

8 hours

3 days

8 hours

Indefinite

(1)The data is for reference only. The actual drying time and recoating interval depend on factors such as paint dry film thickness, ventilation, humidity and previous paint.

(2)The surface must be dry and free of dirt before recoating. The adhesion of subsequent coatings is best when the previous coating is completely cured. If the coating is exposed for a long time, the surface must be roughened before recoating to ensure adhesion between the coatings.


Surface treatment

The painted surface must be dry ; SSPC-SP1 According to the regulations , use solvent to remove all grease from the surface ; use clean water to remove salt and stains from the surface . The corroded area must be repaired with a suitable primer .


Construction conditions

The surface temperature of the substrate shall not be lower than 5 °C and at least 3 °C higher than the air dew point temperature, and the relative humidity shall not exceed 85% (the temperature and relative humidity shall be measured near the substrate).

The surface temperature of the substrate should not exceed 40°C . Otherwise, a suitable spraying method should be selected and appropriate diluent should be added as required to prevent dry spraying. In extreme cases, the dry film thickness of the coating can be appropriately reduced to prevent sagging.

When painting in a confined space, appropriate ventilation equipment must be provided to ensure the cure of the paint film.

After the base material and curing agent are mixed, the temperature must be higher than 15 ℃, otherwise a diluent should be added to achieve the required viscosity for construction.


Recommended Package

The following are typical high performance coating systems:

TO1.79 epoxy zinc-rich primer

1 × 50μm

(Dry film thickness)

TO2.19 epoxy intermediate paint

1 × 100μm

(Dry film thickness)

TO4.60 epoxy topcoat

1 × 50μm

(Dry film thickness)


Store

Must be stored in accordance with national regulations. The storage environment should be dry, cool, well-ventilated, avoid high temperatures and stay away from fire. The packaging container must be kept sealed. The storage validity period is at least 12 months.



Related Products