Physical properties
Color / Glossy Silver / bright
Volume solid content 25%
Flash Point >25 ℃
Volatile organic components ( VOC ) approx. 655 gram / L
Density per litre 1.01 g / centimeter 3
Dry film thickness ( μm ) | Wet film thickness ( μm ) | Theoretical coating rate ( m2 / L ) | |
Film thickness range | 20 – 50 | 80 – 200 | 12.5 – 5.0 |
Recommended film thickness | 25 | 100 | 10.0 |
Construction instructions
Guidelines for airless spraying Nozzle pressure : 12-15 MPa
Spraying Angle: 40-80 Spend
Dilution Ratio: Not Recommended
Guidelines for air spraying
Nozzle pressure : 0.3-0.5 MPa
Dilution ratio: 0-5% (volume ratio)
Suitable for brush or roller application , dilution ratio : 0-5% (volume ratio ) diluent / Cleaning agent 601 Special diluent
Nozzle aperture: 0.22-0.38 mm
Nozzle aperture: 1.2-1.5 mm
Avoid adding excessive thinner, otherwise it will reduce its anti-sagging and gloss of the coating.
Drying time and time between recoating (1)
Substrate temperature | Dry time | Working time | Recoating interval (2) | |
Shortest | longest | |||
30 ℃ | 2 hours | See Note 1 | 4 hours | Indefinite |
(1)The curing of this product requires continuous heating. The following is the recommended heating process:
It gradually heats up to 100 ° C within 30 minutes, 200 ° C within 1 hour, and 450 ° C within 2 hours
If you need to speed up the curing time, you can use TO5.16B in a ratio of 20 : 0.6 ( weight ratio ). Drying agent.
(2)The surface must be dry and free of dirt before recoating. Adhesion is best when the previous coating is completely dry before applying the subsequent coating. If the coating is exposed for a long time, the surface must be roughened before recoating to ensure adhesion between the coatings.
Surface treatment
Steel SSPC-SP1 According to the regulations , use solvent to remove all grease on the surface ; remove surface welding residues and grind welds and sharp edges with appropriate methods ; sandblast until S a 2 . 5 Grade ( ISO 8501 : 1 ) . The steel surface shall be painted immediately after being sandblasted to the specified requirements .
Repairing the corroded part must first be polished with a power tool to St3 Grade or sandblasting to Sa2 or better( ISO8501:1 ).
Construction conditions
The surface temperature of the substrate should be at least 3 °C higher than the air dew point temperature, and the relative humidity should not exceed 85% (the temperature and relative humidity should be measured near the substrate).
The surface temperature of the substrate should not exceed 40°C . Otherwise, a suitable spraying method should be selected and appropriate diluent should be added as required to prevent dry spraying. In extreme cases, the dry film thickness of the coating can be appropriately reduced to prevent sagging.
When painting in a confined space, proper ventilation should be provided to ensure the paint film cures. The paint temperature must be above 15 °C, otherwise thinner should be added to achieve the required viscosity for construction.
Recommended Package
TO1.52 inorganic zinc silicate primer | 1 × 50μm | (Dry film thickness) |
TO5.16 silicone high temperature resistant paint | 1 × 40μm | (Dry film thickness) |
Store
Must be stored in accordance with national regulations. The storage environment should be dry, cool, well-ventilated, avoid high temperatures and stay away from fire. The packaging container must be kept sealed. The storage validity period is at least 6 months.