Physical properties
Color / Gloss by color card / Highlight
Volume solids approx . 33%
Flash point >25 ℃
Volatile organic components ( VOC ) about 500 gram / L
Density Approx. 1.15 gram / centimeter 3
Dry film thickness ( μm ) | Wet film thickness ( μm ) | Theoretical coating rate ( m2 / L ) | |
Film thickness range | 30 – 50 | 90 – 150 | 11.3 – 6.8 |
Recommended film thickness | 40 | 120 | 8.5 |
Construction instructions
Guidelines for airless spraying
Nozzle pressure: 12-15 MPa
Nozzle aperture: 0.38-0.48 mm
Spraying angle: 60-80 Spend
Dilution ratio: 0-3% (volume ratio)
Guidelines for air spraying
Nozzle pressure: 0.3-0.5 MPa
Dilution ratio: 0-10% (volume ratio)
Brush or roller application , dilution ratio: 0-5% (volume ratio )
Thinner / Cleaning Agent 601 Special diluent
Nozzle aperture: 1.2-1.4 mm
Avoid adding excessive thinner, otherwise it will reduce its anti-sagging and gloss of the coating.
Drying time and time between recoating (1)
Substrate temperature | Dry time | Working time | Recoating interval (2) | |
Shortest | longest | |||
10 ℃ | 2 hours | 8 hours | 8 hours | Indefinite |
23 ℃ | 1 hour | 4 hours | 4 hours | Indefinite |
30 ℃ | 30 minutes | 2 hours | 2 hours | Indefinite |
(1)The data is for reference only. The actual drying time and recoating interval depend on factors such as paint dry film thickness, ventilation, humidity and previous paint.
(2)The surface must be dry and free of dirt before recoating. Adhesion is best when the previous coating is completely dry before applying the subsequent coating. If the coating is exposed for a long time, the surface must be roughened before recoating to ensure adhesion between the coatings.
Surface treatment
The painted surface must be dry ; SSPC-SP1 According to the regulations , use solvent to remove all grease from the surface ; use clean water to remove salt and stains from the surface . The corroded area must be repaired with a suitable primer .
Construction conditions
The surface temperature of the substrate should be at least 3 °C higher than the air dew point temperature, and the relative humidity should not exceed 85% (the temperature and relative humidity should be measured near the substrate).
The surface temperature of the substrate should not exceed 40°C . Otherwise, a suitable spraying method should be selected and appropriate diluent should be added as required to prevent dry spraying. In extreme cases, the dry film thickness of the coating can be appropriately reduced to prevent sagging.
When painting in a confined space, proper ventilation should be provided to ensure the paint film cures. The paint temperature must be above 15 °C, otherwise thinner should be added to achieve the required viscosity for construction.
Recommended Package
The following are typical high-performance coating systems:
TO1.26 Aluminum powder chlorinated rubber anti-rust paint | 1 × 75μm | (Dry film thickness) |
TO1.25 chlorinated rubber iron red anti-rust paint | 1 × 75μm | (Dry film thickness) |
TO3.53 acrylic topcoat | 2 × 40μm | (Dry film thickness) |
Store
Must be stored in accordance with national regulations. The storage environment should be dry, cool, well-ventilated, avoid high temperatures and stay away from fire. The packaging container must be kept sealed. The storage validity period is at least 12 months.