English

The first high-grade real stone paint

Product Overview
The first high-grade real stone paint is made of special synthetic emulsion and natural stone, which can provide natural stone for the wall. Stylish three-dimensional decorative effect.It is widely used in the exterior wall projects of large buildings such as residences, hotels, office buildings, schools, etc., and can also be used for interior decoration. The interior design creates a decorative three-dimensional effect.
Contact us
Description

Product Introduction : 

The first high-grade real stone paint is made of special synthetic emulsion and natural stone, which can provide natural stone for the wall.Stylish three-dimensional decorative effect.It is widely used in the exterior wall projects of large buildings such as residences, hotels, office buildings, schools, etc., and can also be used for interior decoration. The interior design creates a decorative three-dimensional effect.


Features : 

◆It has the unique texture of real natural stone and is available in different colors.Excellent mildew resistance, alkali resistance, chemical resistance and weather resistance.

◆Can cover small cracks on the wall.It can adjust to uneven surfaces and has the function of covering up defects on the wall surface.

◆When used with the Shouchuang WR-700 silicone resin topcoat, it can provide a coating system with excellent weather resistance.


Paint  cloth Quantity : 

Theoretical value 5~7 kg/m² (dry film thickness 70 microns)

(The actual paint consumption will vary depending on the construction method, construction conditions and substrate conditions)

Recoating time: more than 24 hours/25℃ .

(Drying time will vary with ambient temperature and humidity)


How to use : 

Use a dedicated single-nozzle or double-nozzle spray gun to spray in steps under the air pressure of 6~8 kg from the air compressor.


Dilute  release : 

If necessary for painting, it can be diluted with clean water. The dilution amount should not exceed 5% and should be fully stirred.

Construction conditions : Construction at temperatures above 5°C and relative humidity below 85%, wall moisture content below 10%, PH Value less than 10, avoid rainy days And construction on windy days.


Make Instructions : 

Before spraying, the wall surface must be firm, dry, flat and clean.

Walls with cracks and other defects can be repaired and smoothed with special putty.

Set up partitions according to design requirements, and shield and protect areas not to be sprayed according to specific circumstances.

To prevent uneven stubble, it is recommended that there should be a connecting strip every 1.5 m² or adhesive tape should be used for isolation.


Construction steps: 

The first coat is primer, the second coat is spraying real stone paint, and the third coat is glazing. The interval time should be based on the corresponding.It can be adjusted appropriately according to the different changes in temperature and environment.


Related Products